Steel Door Installation for TCC Plant in Middlesbrough

Site: Steel Door Installation for TCC Plant Location: Middlesbrough Overview Farrell Fabrication was engaged to supply and install two high-quality steel door sets at the TCC Plant in Middlesbrough. This project required precision engineering and expert installation to meet the facility’s operational needs and safety standards. Scope of Work Supply of Materials Farrell Fabrication provided […]
Shutter Installations at Woodsmith Mine

Site: Shutter installation at WOodsmith Mine Location: North Yorkshire At Woodsmith Mine, ensuring robust security and efficient functionality is paramount, especially when dealing with critical access points to a shaft that services a tunnel extending from Whitby to the Wilton site at Middlesbrough. Recently, we completed an extensive project to enhance the mine’s security and […]
Whitehouse Business Park Middlesbrough

Site: Whitehouse Business Park Location: Middlesbrough A fresh installation for Whitehouse Business Park in Middlesbrough. The customer approached us to manufacture and install a selection of roller shutters and doors at their new site. An installation of 20 3 phase industrial roller shutter doors to provide the best security whilst also ensuring the units are […]
Smyths Toys Stockton on Tees

Client: Smyths Toys Location: Stockton on Tees Following a ram raid the site was temporary boarded up and a complete new shopfront was required Smyths toys knew exactly who to contact. Being closed for too long would be very damaging for business and the high levels of security required were not in place. We saw […]
Teeside Airport Departures Suite

Site: Teeside Airport Location: Departures Suite Farrell Fabrications were contacted by Teeside Airport to Manufacture and install new roller shutter doors to enhance the security of the airport at the departures suite. Not only did the shutter have to be strong and secure, but it also had to fit in with the airport style. Manufacturing […]
Smyths Toys Thurrock

client Smyths Toys Site: Thurrock The existing smyths store was being relocated to a new larger store Security and timing was crucial for the relocation so with more vulnerability came the need for a higher level of protection. Timing was a priority as the site had to be secure before any of the interior fit-out […]